Overview
LCL Plumbing & Drainage was engaged by MC Building to complete the full below-ground drainage package for a new childcare centre on Cresswell Street in Clyde North. The work covered sanitary sewer, trade waste and grease trap installation alongside stormwater lines, pits and charged, sealed tank connections, all coordinated closely with the builder and other trades across an active construction site. Every drainage point was recorded using our GPS surveying technology to create a permanent, accurate as-built record in PDF and CAD formats, giving MC Building a reliable reference for future maintenance and facility management.
The Challenge
- Coordinating sanitary, trade waste and stormwater services across an active construction site.
- Setting out drainage points accurately before slabs and structures progressed.
- Protecting installed underground drainage from construction activity, machinery and debris.
- Providing a reliable, permanent record of the completed underground infrastructure.
Our Solution
- Installed the complete sanitary sewer and trade waste drainage system.
- Fitted the grease trap and associated pipework.
- Completed stormwater lines, pits and charged, sealed tank connections.
- Carried out a GPS survey of every drainage point, supplying PDF and CAD as-builts.
- Backfilled with crushed rock, mechanically compacted, and lawfully disposed of excess spoil.
- Ran three staged CCTV inspections throughout construction.
Result
The complete drainage system was installed, tested, inspected and documented, giving MC Building a reliable underground drainage package and an accurate permanent record for future maintenance and facility management. Three staged CCTV inspections and full GPS as-built documentation mean the site has a verified drainage system built for long-term operation.