Overview
LCL Plumbing & Drainage completed a pit-to-pit UV CIPP rehabilitation of a 300 mm reinforced concrete stormwater line at 44 Crispe Street, Reservoir VIC. Pre-work CCTV had found repeated circumferential cracking, defective joint welds and hanging or intruding seals through the section, and a conventional repair would have meant excavating through the road verge and footway. Using UV CIPP relining, the team restored the pipe from the existing access pits without digging up the street.
The Challenge
- Repeated circumferential cracking, defective joint welds and hanging or intruding seals identified through the pit-to-pit section.
- A conventional replacement would have required excavation through the road verge and footway.
Our Solution
- Cleaned and prepared the host pipe with high-pressure water jetting and vacuum recovery.
- Installed a continuous SAERTEX-LINER Type S+ UV-cured liner through the 300 mm host pipe.
- Used the existing pits for access, avoiding full-length excavation.
- UV cured, trimmed and finished the liner at the pit interfaces.
- Carried out pre- and post-installation CCTV verification.
Result
Final CCTV recorded 30.39 m inspected with zero structural defects and zero service defects, achieving Structural Grade 1 and Service Grade 1. The rehabilitated stormwater line was left clear and fully operational.